A $2,400 fixed quote is 28.24 hours of your rate

At $85 an hour a $2,400 fixed price only works if the job closes in 28.24 hours. It took 34.5, so the quote paid $69.57 an hour and gave away $532.50.

A joiner's bench in window light: two crossed wooden rules on a planed board, a heap of pale shavings and a pencil.
Illustration: SellersMath — generated artwork for this piece, quoting a passage from its own argument.

The answer

At $85.00 an hour, $2,400.00 buys 28.24 hours of your time. The job took 34.5, so the fixed price paid $69.57 an hour and cost $532.50 against what the clock was worth. Quote the fixed number off the estimate plus a contingency, never off the number that wins the job.

The arithmetic

The estimate was 30 hours at $85.00, which is $2,550.00 of labour. The quote went out at $2,400.00. That is not a small courtesy on the estimate, it is a bet: $2,400.00 ÷ $85.00 = 28.2353 hours. Finish inside 28.24 hours and the fixed price pays better than the clock. Finish outside it and you are working for less than your rate, on purpose, without saying so.

It runs the other way too, and that is the whole argument for fixed pricing.

The job took 34.5 hours. At the rate that is 34.5 × $85.00 = $2,932.50. The fixed price paid $2,400.00, so $532.50 of labour went unbilled, which is 6.26 hours at $85.00. Per hour actually worked the job paid $2,400.00 ÷ 34.5 = $69.57, which is 18.2% below the rate on the quote. That $69.57 is the number to remember, because it is the rate you agreed to.

It runs the other way too, and that is the whole argument for fixed pricing. Had the job closed in 24 hours, $2,400.00 ÷ 24 = $100.00 an hour, 17.6% above the rate, and nobody would have queried it. The fixed price is not the mistake. Quoting it without the hours behind it is.

The fix is arithmetic, not nerve. Price the fixed quote off the estimate plus a contingency: $2,550.00 × 1.10 = $2,805.00. That is 33.00 hours of cover at $85.00, exactly. The same 34.5-hour job then pays $2,805.00 ÷ 34.5 = $81.30 an hour and loses $127.50, which is 1.50 hours instead of 6.26. Materials are pass-through and appear at cost in either document, so they are not part of this sum. Only the hours move.

The three mistakes

The first is quoting the discount instead of the price. $2,400.00 against a $2,550.00 estimate is 5.9% off, offered to win a job whose hours nobody had measured yet. A fixed price is a promise about hours; cutting it without cutting scope is a promise to work faster.

The second is a fixed total with no scope beside it. “Supply and fit, $2,400.00” gives the customer a number and gives you nothing to point at when the job grows a second room. The exclusions are the price as much as the total is.

The third is not recording the hours on fixed work. Hourly jobs teach you your rate. Fixed jobs only teach you whether you guessed, and only if somebody writes 34.5 down next to 30.

What the document must carry

The day rate, the estimated hours, the contingency as its own line, the fixed total, and the list of what the fixed price excludes. Then the sentence that decides the argument: additional work is charged at $85.00 an hour, quoted before it starts. A fixed price with a rate behind it survives a change order; one without it has to be renegotiated from nothing.

Two things worth doing before the next one goes out. Work out what an hour of your week actually earns rather than what you charge for it, because the gap is the unbilled hours. And when the job is hourly rather than fixed, print worked hours and billed hours as two numbers — the rounding that turns 7.4 hours into 7.5 is a conversation, not a secret. Where the client will not accept a fixed number at all, a time and materials invoice with a not-to-exceed cap is the same arithmetic with the hours left visible.

When this doesn’t apply

On jobs under a few hundred dollars the admin of tracking hours costs more than the variance, and a fixed price is the honest instrument. On repeat work, where a customer has bought the same job four times, the estimate is a measurement rather than a guess and the contingency can shrink to materials only. And on work whose scope genuinely cannot be listed in advance, a fixed price is a guess dressed as a promise: the cap on a time and materials arrangement is the better instrument, because it puts the ceiling in writing once instead of relitigating it per job.