SellersMath
Paperwork

Deduct the unpaid break before overtime, not after

Five days of 8, 8.5, 9.5, 7.5 and 6 hours minus a 30-minute daily break is 37 paid hours: 36 regular, one at time and a half.

Editorial illustration quoting the piece: “Salaried staff and day-rate subcontractors do not have an overtime threshold in this sense, whatever their”
Illustration: SellersMath — generated artwork for this piece, quoting a passage from its own argument.

The answer

Take the break off the day before you test for overtime. Five days of 8, 8.5, 9.5, 7.5 and 6 hours with a 30-minute unpaid break each day is 39.5 hours worked, 2.5 hours of breaks, 37 paid hours. Of those, 36 are regular and 1 is at time and a half: $1,800.

The arithmetic

Add the days: 8 + 8.5 + 9.5 + 7.5 + 6 = 39.5 hours in the chair. Five breaks of 0.5 hours is 2.5 hours, so paid hours are 39.5 − 2.5 = 37.0.

Do it in the other order and the same week bills differently.

Now day by day, after the break: Monday 7.5, Tuesday 8.0, Wednesday 9.0, Thursday 7.0, Friday 5.5. Those add to 37.0, which is the check. Against an 8-hour daily threshold, regular hours are 7.5 + 8 + 8 + 7 + 5.5 = 36.0 and overtime is the 1.0 hour over the threshold on Wednesday. At $48 a regular hour and 1.5× for overtime: 36 × $48 = $1,728, plus 1 × $72 = $72, for $1,800. The effective rate per paid hour is $1,800 ÷ 37 = $48.65.

Do it in the other order and the same week bills differently. Test Wednesday’s 9.5 hours first: 8 regular plus 1.5 overtime, then knock the half-hour break off the overtime. You have 36 regular hours, 1.0 overtime hour and one break hour that came off premium time rather than regular time, so the week is $1,728 + $108 − $24 = $1,812. Twelve dollars more, from the order of two subtractions, on one week of one person’s time.

The three mistakes

The first is the order above. It is not a big number per week, which is exactly why it survives for years and then shows up in an audit as a pattern.

The second is a weekly threshold used where the contract says daily, or the reverse. Forty hours a week and eight hours a day are different tests, and a week with two ten-hour days passes one and fails the other.

The third is an unsigned timesheet. A client who never signed the grid can dispute every line of it, and the invoice is then a claim rather than a bill.

What the document must carry

A grid with a column per day and the hours actually worked. The break, shown per day or as a total, and the threshold and multiplier stated in words. Expenses re-invoiced as their own line. The total hours, the split between regular and overtime, the rate applied to each. A signature line for the client’s site contact, because the signature is the whole point of putting the timesheet on the invoice page. The timesheet invoice generator prints the grid and the invoice on one sheet, so the overtime line can be checked against the day that produced it.

When the arrangement is simpler than a grid, a straight hourly invoice with the rounding rule on it is enough.

When this doesn’t apply

Salaried staff and day-rate subcontractors do not have an overtime threshold in this sense, whatever their contract says about hours. Where a union agreement or an award sets the multiplier, the agreement wins over anything on this page. And on a job billed by the day, the break is inside the day rate and the whole calculation is unnecessary.

The point is not the $12. It is that a timesheet invoice is the only invoice a client can audit line by line without trusting you, which is why it gets paid faster than a total in a box. Keeping the same hours in a sheet you can total at month end is what makes the next invoice an export rather than a retype.